Bald Mountain Expansion Bald Mountain Expansion

Bald Mountain Expansion

Elko, Nevada

TIC was awarded the contract for the construction of the Bald Mountain Expansion Project. Scope of work consisted of concrete, pre-engineered buildings and structural steel at the existing open pit gold mining facility.

TECHNICAL DETAILS:

  • Designed, supplied and installed pre-engineered buildings
  • Designed, supplied and installed rubber roll-up truck doors
  • Supplied, fabricated and erected structural and miscellaneous steel for process plant and carbon column supports
  • Supplied, fabricated and erected all sheet metal deck for elevated concrete floors and erected all crane rail including clips
  • Rough set all overhead bridge cranes on rails weighing 25.5/15 tons and six tons.
  • Designed, supplied, fabricated and installed a 36’dia. X 14’-6” h, Pregnant solution tank
  • Set ten tanks, carbon columns and interconnecting launders and distribution box, barren solution tank, cyanide tank, two carbon storage tanks and an anti-scalant tank