McLaughlin Gold Project
Lower Lake, California
TIC was the general contractor for the construction of grassroots 3,500 TPD gold processing facility. Scope of work included crushing, reclaim and grinding installations and the autoclave oxidation/carbon-in-pulp process facility
TECHNICAL DETAILS
- One 42” jaw crusher
- A 60” x 28’ hydraulic apron-feeder
- A 294’ x 42” belt conveyor in an 11’ x 17’ multi-plate tunnel
- A 1,500hp 22’ x 7’ Kopper SAG Mill
- A 3,000hp 15.5’ x 22’ Kopper Ball Mill
- Three 53’ horizontal/cylindrical autoclaves with 13’ 9 1/2” inside shell dia.
- Autoclave fueled by 300 tpd cyrogenic oxgen plant