TIC provided structural, mechanical, piping and electrical and instrumentation for the construction of the 2 x 1, 525 MW combined cycle expansion project.
Technical Details
- Two GE 7FA gas turbine generators
- Two Alstom HRSGs
- One GE D11 steam turbine generator
- 5,500 cy of concrete
- 1,690 tons of structural steel
- 80,000 lf of piping
- 8,108 lf of cable tray, 170,067 lf of conduit and over 1,233,000 lf of wire and
- cable