Henderson 2000

Henderson 2000

Empire, Colorado

TIC was the general contractor for the installation of 10.5 miles of underground conveyor, 4.5 miles of above ground conveyor, and underground crusher installation. This was the world’s longest single-flight conveyance system at the time of installation.

TECHNICAL DETAILS

  • A Fuller 54” x 84” crusher
  • 10,000 cy concrete
  • 2,500 tons of building steel
  • 708 tons of drive structural steel
  • 14,803 lf of pipe
  • 25,000 lf conduit
  • 32,770 ft of HV wire
  • 76,000 ft LV cable
  • 146,834 ft of instrument cable
  • 6,820 ft of cable tray
  • 84,000 ft of ground wire