Jaxport Berth 22
Jacksonville, Florida
The JAXPORT Berth 22 project at Blount Island Terminal included constructing a new PSC pile-supported breasting dolphin and a PSC pile-supported mooring dolphin, complete with double-tee walkways. This project also involved replacing the existing fender system at Berth 22 and conducting concrete and pile jacket repairs on the existing berth. These enhancements are designed to improve docking efficiency and ensure long-term structural resilience at this critical terminal.