Kansas Interconnect Project
Confidential Location, Kansas
TIC constructed a 345kV collector substation and approximately 28 miles of double-bundle, single-circuit 345kV transmission line to interconnect with an existing wind farm. The scope of work included an addition to the existing substation, performed outside of the existing fence to mitigate risk before combining the substations.